Pukka Pies operated an aging ammonia refrigeration plant that, while maintaining relatively good overall condition, required strategic upgrades in critical areas. The evaporative condenser showed clear signs of wear and needed proactive replacement before equipment failure could impact their high volume production environment.
The challenge was to design and deliver a comprehensive upgrade solution while minimising disruption to Pukka Pies’ ongoing operations. As the project took place on an operational site, health and safety considerations were paramount to avoid downtime and safety incidents.
Integral Cooling Tech collaborated with leading manufacturers and highly skilled contractors to execute a comprehensive project plan that delivered exceptional results within an accelerated timeline. The project included:
The works were meticulously scheduled in collaboration with Pukka Pies’ production team to ensure minimal impact on daily operations. Safety protocols were rigorously followed throughout, resulting in zero incidents during the project.
The evaporative condenser replacement project was successfully completed and handed over in line with timeline expectations. Key outcomes included: