The challenge
Lidl’s Regional Distribution Centre (RDC) required a new temperature controlled storage chamber specifically for its chocolate products. The existing ambient storage area needed to be upgraded to maintain a consistent temperature, ensuring optimal conditions for chocolate preservation.
The challenge was to design and deliver an energy-efficient solution while minimising disruption to Lidl’s ongoing operations. As the project took place on an operational site, health and safety considerations were paramount to avoid operational downtime and safety incidents.
Solution
Integral UK Ltd. designed a bespoke system that maximised the use of existing infrastructure to deliver best value. The project included:
The works were meticulously scheduled in collaboration with Lidl’s Engineering and Logistics teams to ensure no impact on daily operations. Safety protocols were rigorously followed throughout, resulting in no incidents during the project.
Result
The Chocolate Store project was successfully completed and handed over in line with timeline expectations. Key outcomes included: