Case study

St George’s Barracks, Rutland

  • Client
  • Services provided M&E service
  • Sector Central & Local Government

The works comprise the capital replacement of 7.5 Mw of coal fired boiler systems, along with single oil fired boiler with gas fired heating plant. These works occur across three main buildings within the campus arrangement. Key works delivered around the central boiler house including modifications to previous coal store for new plant and equipment.

The infrastructure works are carried out on a live site and full temporary services had to be in place to ensure the operation of this critical establishment was not compromised.

The project incorporated full off site fabrication to ensure site time was kept to a minimum and that works could be undertaken in parallel with asbestos, demolition and enabling works. The aim of the project is to reduce the energy consumption and subsequent carbon emission from the operations of the site heating and hot water requirements.

This is to be achieved through the introduction of new gas fired boiler system arrangements, along with introducing a gas fired CHP generator, new BMS controls and associated metering.

To enable the provision of the new gas fired plant major new gas services infrastructure networks are required to be bought on site, along with the provision of a new transformer and on site HV works to incorporate the power generation from the CHP system.

Additionally, upgrade of a section of the existing site district heating main arrangement is required to support the provision of a direct connection to serve heat exchangers in replacement of an existing oil boiler serving the swimming pool and leisure facilities on site.

The project has been delivered using a full 3D integrated model, BIM technology using Revit MEP and is the first project for the public sector client to be delivered using these techniques.

Scope of works:
  • Full strip out of redundant 7.5 MW coal fired boiler plant including removal of plantroom side wall
  • Asbestos removal and full antiquated plant strip out
  • x3 gas fired 7.5Mw boilers complete with new Riello burners
  • New medium pressure gas main from site boundary to central boiler house
  • x3 flues
  • x10 circulation pumps incl. Primary set
  • Site wide district heating main replacement
  • New Combined Heat and Power Unit (CHP)
  • Trend BMS system
  • Mezzanine plant deck with crane / hoist
  • Testing & commissioning
  • Temporary boiler plant to ensure site wide operation maintained for live MoD site
Share:

Hello! Welcome to our new web site. This site is not fully supported in Internet Explorer 11 (and earlier) versions. Please upgrade your Internet Explorer browser to a newer version.

As an alternative, you can use either of the options below to browse the site:

  1. Use Google Chrome browser. Here is the download link.
  2. Use Firefox browser. Here is the download link.

Thank you.